Khalifa Fund Award 2009
Abu Dhabi, UAEAO Technology at Khalifa Fund Award 2009
[masterslider id="102"]
LOCATION:
ADNEC, Abu Dhabi
DATE:
July 8th, 2009
AO EQUIPMENT:
885 Solaris Lines incl. PSU
125 sqm LED Wall (Martin LC Frames)
LD:
mamemo production, Sam Katiela; A&O Technology
SUPPORT:
A&O Technology Middle East
PHOTOS:
A&O Technology
OCCASION:
Khalifa Fund Award
LED wall as backdrop to support and extend the video projection
SPECIAL FEATURE:
Solaris lines and LED frames at the entrance assembled as cube